Equipment · power and reach
Move the heavy parts.
Integrate suitable cranes, excavators and handling equipment with sensing, positioning and task instructions. Develop purpose-built handling tools where the assembly needs them.
Our work · From design to assembly
The system is built: design, engineering, documentation and the assembly plan run end to end with Bob. The next milestone takes the assembly onto the ground in a physical demonstrator.
Planned physical demonstrator
Our first home-assembly demonstrator is planned for a robotics precinct: a test environment for robotics and autonomous equipment.
Start with the structure and shell. Rehearse the lifts, assemble the components, inspect the connections and measure the work. Repeat until the process is reliable enough to advance.
Initial trials retain human supervision, confirmation of machine movements and human fastening. Plumbing, electrical work, finishes and the approvals for an occupied home are later parts of the full delivery programme.
Planning and development stage. Site arrangements, equipment selection and engineering readiness remain to be confirmed. No completion date or fully autonomous build is claimed.
What the demonstrator must prove
The milestone is a measured physical process, followed by a better second attempt.
Bob: design, engineering and documents
Bob turns a plan into a house thought through: the steel frame, the walls, the roof, the services, every check and every price, in 3D.
From the same house it draws the plans, sections, elevations and details, the planning set, the quote pack, the factory’s shop files and the lift plan. Change anything and all of it follows.
Project-specific engineering sign-off and approvals are still required before construction.
One building model, connected outputs
Output coverage depends on the model, system and agreed scope.
Construction robotics programme
Our thesis combines the power and reach of large construction machines with the dexterity of smaller robots and, as capability develops, humanoids.
Equipment · power and reach
Integrate suitable cranes, excavators and handling equipment with sensing, positioning and task instructions. Develop purpose-built handling tools where the assembly needs them.
Robots · dexterity
Develop precise alignment, fastening and inspection tasks. Humanoids are a research direction; human crews perform the connection work in the first physical trials.
Software · coordination
Turn the building model into a checked assembly sequence. Track each part, machine and completed connection, with human approval and independent safety controls.
The interaction we are developing
The instruction needs more than language: a known part, a verified destination, sufficient reach, a clear path and an inspected connection before release.
One assembly cycle
Our current work includes component models and simulated assembly sequences. Integrated field autonomy and robotic fastening remain to be demonstrated.
Learning from the physical work
Cameras and machine sensors can connect what was planned with what actually happened: movement, placement, interruptions and rework.
We are exploring data collection on construction equipment to improve our own systems, and whether appropriately permissioned data could be useful to other robotics developers. This is early research, with data rights, quality and commercial demand still to establish.
Property research
A research portfolio maps 48 actual properties and preliminary layouts for 80,528 lots.
Inspect cadastral boundaries, historical terrain, roads, lot layouts and civil layers. The exercise makes the scale visible and exposes the investigations and infrastructure needed to turn an ambition into a project.
Research snapshot: 14 October 2026. Provisional lots, not approved housing supply. Land control, current survey, approvals, engineering and commercial feasibility are still open. The 80,000-home ambition is not a verified estimate of today’s housing shortfall.
Research portfolio
Each study runs from land and terrain to lot layout, civil layers and the issues still to settle.
Next step
We welcome people who can help prove the building system, supply a capability or bring a suitable project.